We’ve provided scaffolding to Universal Homes for decades, and Hobsonville Point is a good example of why that relationship works — safe, efficient, on time, staying a step ahead of every other trade on site.
Residential schedules are tight, so the pressure on scaffolding to be ready on time is intense. On builds like this we work ahead of the other trades, getting the scaffold up before there’s any risk of a fall.
Using the Layher Allround system, we provide safe access for every trade on site — heavy-duty loading bays, access platforms over retaining walls, bridges over trench work, aluminium mobile scaffolds, internal stair scaffolds, lower-roof scaffolds and roof-edge protection among them. Advanced guardrails mean even our own scaffolders are never on a live edge during install or dismantle, lowering the risk for everyone.
Because residential sites sit close to roads and the public, we also provide debris netting and gantry walkways where needed. Detailed planning keeps site workers’ wellbeing first while productivity stays high — and projects like this run continuously across the Auckland region.